Laurel School Facility Project

Background

The Laurel campus sits on approximately 6.5 acres in Atherton and serves approximately 460 students, kindergarten through third grade. The Laurel campus includes 23 standard classrooms, art classroom, science classroom, mini-multipurpose room, multipurpose building, library building, administration building, and computer lab facilities. The campus has 5 classroom pods that are interlinked by pathways in a heavily landscaped park like setting. The campus also has a main courtyard area for school wide gatherings, lunch shelters, kindergarten play area, and a field and play area for 1st through 3rd grade students. Located at the Laurel School site is the new Children Oak Center serving special needs pre-school students and occupational therapy District wide. Total construction cost spent at Laurel to date is $10,231,832 with a total project cost of $12,766,756.

Completed Projects
 

Laurel Mini-Multi:




New field and play area:



Covered lunch shelter:


Laurel Art & Music classrooms built around oak tree...



Pod of classrooms:




The Pre-school/Occupational Therapy Building and playground area are complete. The building has been formally named "The Heritage Oak Children's Center".






Front of School:

Completed Projects
Pre-School/Occupational Therapy:
  • New 2400SF modular facility to serve special need students from the age of 3 years old and to serve K-5 students who have occupational therapy needs. The facility includes office space, small instructional spaces, and conference room
  • Small play area for the pre-school/OT building.
New Building, Site Work and Fire Lane:
  • New 5 classroom building pod with a common space area and bathrooms
  • New 3 classroom building pod with a common space area and bathrooms
  • New specialty classrooms for music and science/art rooms
  • New Mini-multipurpose room
  • New kitchen area bathrooms and storage to serve the school
  • Covered lunch area and plaza with outdoor stage
  • Fire access road to the back of the school site
  • Reconfigured parking lot and drop/off pick area
  • Landscaping work related to the new improvements
Modernization:
  • Replacement of older windows throughout the campus
  • Replacement of door/hardware throughout the campus
  • Replacement of the fire alarm system to conform with new DSA requirements
  • Installation of "Smart Boards" in existing classrooms
  • Modifications to the Library
  • New covered entrance structure and school frontage enhancements
  • Site path ADA improvements
  • Improvements to the Administration HVAC system
  • Campus-wide lighting improvements
Field and Play Area Improvements:
  • New expanded field with new irrigation system
  • Re-configured hardcourt play area
  • Upgraded play structure area
  • Upgraded kindergarten play area